The road was an existing poor surfaced dressed road with lack of drains at some sections and was packaged for reconstruction. The project is located at Elmina in the KEEA Municipal Assembly and was awarded to M/S Legna Construction Works Limited for a duration of twenty-four (24) calendar month. The total length of the project is 4.5km which serves as an alternative access connecting the Elmina town and the N1 at Ataabaadzi.
Award Date | June 29, 2018 |
Commencement Date | November 20, 2018 |
Funding Agency | GRF |
The selected roads under the project were unengineered earth roads with erosions and gulley. The project is located at Kasoa in the ASEM Assembly and was awarded to M/S New Modern World Company Limited for a duration of eighteen (18) calendar month. The total length of the project is 6.6km of selected roads connecting Kasoa – Obuom and the Kasoa – Bawjuase road.
Award Date | June 29, 2018 |
Funding Agency | GRF |
Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at Cape coast in the CCMA and was awarded to M/S Legna Construction Works Limited for a duration of twenty (24) calendar month. The total length of the project is 10.0km of selected roads.
Award Date | June 29, 2018 |
Funding Agency | GRF |
An existing poor gravelled road packaged to be rehabilitated. The project is located at Kasoa in the ASEMA and was awarded to M/S New Case Properties.The total length of the project is 7.2km main access road connecting the Nyanyano road and millennium city.
Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing.
Award Date | October 3, 2016 |
Funding Agency | GRF |
18.0 % physical progress
Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at Swedru in the AWMA and was awarded to M/S Maripoma Enterprise Limited. The total length of the project is 22.0km of selected roads.
Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time and also reduce travel cost.
Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of crush rock base and asphaltic concrete.
Award Date | June 29, 2018 |
Funding Agency | GRF |
14 % physical progress
Unengineered selected roads packaged to be rehabilitated. The project is located at Kwaprow and Ankful in two MMDAs (CCMA and KEEA) and was awarded to M/S New Case Properties
Investment Limited for a duration of twenty four (24) calendar month. The total length of the project is 7.4km connecting CCMA and KEEA at Kwaprow and Ankaful respective.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.
Award Date | June 26, 2018 |
Funding Agency | GRF |
24.77 % physical progress
Unengineered selected roads with erosions and gulley packaged for construction. The project is located at Kasoa in the ASEMA and was awarded to M/S Fingerprints Construction and Trading Limited. The total length of the project is 5.9km of selected roads connecting Kasoa – Bawjiase road to the Colomba road and Opekuma/Ofaaakor to Big Apple Junction .
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.
Award Date | October 22, 2018 |
Funding Agency | GRF |
31.04% physical progress
Unengineered selected roads with erosions and gulley packaged to be rehabilitated. The project is located at Komenda in the KEEAMA and was awarded to M/S Kingspok Company Limited. The total length of the project is 5.07km of selected roads within the Komenda Town.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.
Award Date | July 30, 2019 |
Funding Agency | GRF |
31 % physical progress
Unengineered selected roads with erosions and gulley packaged for construction. The project is located at Kasoa in the ASEMA and was awarded to M/S Obokom Civil Engineering Limited. The total length of the project is 5.20km of selected roads within three communities.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding, and enhance economic and social activities.
Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, Primer seal & Seal and traffic management and safety.
Award Date | July 30, 2019 |
Funding Agency |
GRF |
38.61 % physical progress
Unengineered selected roads with erosions and gulley and section of the main surfaced dressed Winneba road with defects packaged to be rehabilitated and asphalt overlaid respectively. The project is located at Winneba in the EMA and was awarded to M/S Lancaster Construction Limited. The total length of the project is 2.40km of selected roads within three communities.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities, strengthen the existing pavement structure and correct the surface defects,
Construction of 0.6m and 0.9m U-drains, laying of edge beams, construction of culverts, laying of base and sub-base courses, surface dressing and asphaltic overlay and traffic management and safety
Award Date | May 29, 2019 |
Funding Agency | GRF |
24.65 % physical
Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Winneba in the EMA and was awarded to M/S Lancaster Construction Limited. The total length of the project is 2.60km of selected roads in two communities.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | April 14, 2020 |
Commencement Date | January 29, 2021 |
Completion Date | January 29, 2022 |
Contract sum | GH¢ 5,677,514.30 |
Funding Agency | GRF |
18.59 % physical progress
Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Kasoa in the ASEMA and was awarded to M/ Traq Construction Limited. The total length of the project is 8.55km of selected roads.
Award Date | July 13, 2020 |
Funding Agency | GRF |
9.45 % physical progress
Selected existing graveled roads with erosions and gulleys with drains at some sections, packaged to be upgraded to seal level. The project is located at Elimna Zongo in the
KEEAMA and was awarded to M/ Orel City Company Limited for a duration of eight (8) calendar month. The total length of the project is 1.08km of selected roads.
Aimed to improve accessibility, reduce travel time and cost, and enhance economic and social activities.
Drainage works, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | April 20, 2020 |
Funding Agency | GRF |
58.0 % physical progress
Selected existing graveled roads with erosions and gulleys with drains at some sections, packaged to be upgraded to seal level. The project is located at Elimna Zongo in the
KEEAMA and was awarded to M/ Orel City Company Limited. The total length of the project is 1.08km of selected roads.
Aimed to improve accessibility, reduce travel time and cost, and enhance economic and social activities.
Drainage works, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | April 20, 2020 |
Funding Agency | GRF |
60.0 % physical progress
Selected gravelled and unengineered roads with erosions and gulleys, packaged for rehabilitation. The project is located at Saltpond in the MMA and was awarded to M/S Orel City Company Limited. The total length of the project is 4.69km of selected roads.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of and traffic management and safety.
Award Date | August 13, 2020 |
Funding Agency | GRF |
53.1 % physical progress
Selected graveled and unengineered roads with erosions and gulleys, packaged for rehabilitation. The project is located at Saltpond in the MMA and was awarded to M/S Walker Construction Limited. The total length of the project is 5.31km of selected roads.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, primer seal and seal and traffic management and safety.
Award Date | August 13, 2020 |
Funding Agency | GRF |
51.55% physical progress
Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at
Cape coast in the CCMA and was awarded to M/S Maripoma Enterprise Limited. The total length of the project is 25.0km of selected roads.
Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time.
Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.
Award Date | September 22, 2020 |
Funding Agency | GRF |
42.0 % physical progress
Selection of the Kasoa – Bawjiase road (Kasoa overpass – Oklu Nkwanta) with poor surfaced condition and lack of drainage facility was packaged to be overplayed with hot mix asphaltic concrete. The project is located at Kasoa in the ASEMA and was awarded to M/S Aspire Resources Limited. The total length of the project is 8.0km of selected roads.
Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time.
Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.
Award Date | September 22, 2020 |
Funding Agency | GRF |
6.97% physical
Unengineered selected roads with erosions and gulleys, packaged to be rehabilitated. The project is located at Twifo Praso in the TAMA and was awarded to M/S China Jiangxi Engineering Ghana Limited. The total length of the project is 6.20km of selected roads within three communities.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, primer seal and seal and traffic management and safety.
Award Date | November 24, 2020 |
Commencement Date | November 3, 2021 |
Completion Date | November 3, 2023 |
Contract sum | GH¢17,230,289.02 |
Funding Agency | GRF |
5.05 % physical progress
Selected gravelled and unengineered roads with erosions and gulleys, packaged for
rehabilitation. The project is located at
Mankessim in the MMA and was awarded to M/S Orel City Company Limited. The total length of the project is 4.69km of selected roads
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | November 24, 2020 |
Funding Agency | GRF |
20.98 % physical progress
Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Aona Duakwa in the AEMA and was awarded to M/Palace View Home Limited. The total length of the project is 4.50km of selected roads.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | 9/22/2020 |
Funding Agency | GRF |
6.15 % physical progress
Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Winneba in the EMA and was awarded to M/S Miggeron Company Limited. The total length of the project is 3.33km of selected roads in two communities.
Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.
Award Date | 4/14/2020 |
Funding Agency | GRF |
11.88 % physical progress
Employer: Ministry of Road and Highways
Employer’s representative: Department of Urban Roads
Contractor: M/S Kumi Korsah Ltd.
Consultant: M/S Broad Consult Ltd.
Physical progress achieved by the contractor as at end of December 2022 is 94%.