1. PARTIAL RECONSTRUCTION OF BANTUMA ROAD AND ADJOINING LINKS – CAPE COAST (4.50KM)

The road was an existing poor surfaced dressed road with lack of drains at some sections and was packaged for reconstruction. The project is located at Elmina in the KEEA Municipal Assembly and was awarded to M/S Legna Construction Works Limited for a duration of twenty-four (24) calendar month. The total length of the project is 4.5km which serves as an alternative access connecting the Elmina town and the N1 at Ataabaadzi.

  • Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
  • Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of crush rock base and asphaltic concrete.
  •  

Award Date                    

June 29, 2018

Commencement Date    

November 20, 2018

Funding Agency               

GRF

 

  • 14 % physical

 

2. CONSTRUCTION OF AKWELLEY TRANSFORMER – OBUOM ROAD AND KAEMEBRE MAIN ROAD (6.60KM)

The selected roads under the project were unengineered earth roads with erosions and gulley. The project is located at Kasoa in the ASEM Assembly and was awarded to M/S New Modern World Company Limited for a duration of eighteen (18) calendar month. The total length of the project is 6.6km of selected roads connecting Kasoa – Obuom and the Kasoa – Bawjuase road.  

  • Aimed to improve accessibility, reduce travel time and cost, reduce traffic congestion (Kasoa – Obuom and the Kasoa – Bawjuase road), reduce flooding and enhance economic and social activities.
  •  
  • Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of crush rock base and Primer Seal and Seal.
  •  

Award Date

June 29, 2018

Funding Agency               

GRF

 

  • 63 % physical progress

ASPHALTIC CONCRETE OVERLAY IN CAPE COAST (10.00KM)

Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at Cape coast in the CCMA and was awarded to M/S Legna Construction Works Limited for a duration of twenty (24) calendar month. The total length of the project is 10.0km of selected roads. 

  • Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time and also reduce travel cost.
  •  
  • Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.
  •  

Award Date                    

June 29, 2018

Funding Agency

GRF

 

  • 14.0 % physical progress

REHABILITATION OF MILLENNIUM CITY JUNCTION PENTECOST RETREAT CENTRE (7.20KM)

An existing poor gravelled road packaged to be rehabilitated. The project is located at Kasoa in the ASEMA and was awarded to M/S New Case Properties.The total length of the project is 7.2km main access road connecting the Nyanyano road and millennium city.  

  • Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing.

  • Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.
  •  

Award Date 

October 3, 2016

Funding Agency

GRF

 

18.0 % physical progress

EMERGENCY ASPHALTIC OVERLAY OF SELECTED ARTERIAL AND COLLECTOR ROADS IN AGONA WEST MUNICIPALITY

Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at Swedru in the AWMA and was awarded to M/S Maripoma Enterprise Limited. The total length of the project is 22.0km of selected roads.

  • Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time and also reduce travel cost.

     

Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of crush rock base and asphaltic concrete.

Award Date      

June 29, 2018

Funding Agency   

GRF

 

14 % physical progress

REHABILITATION OF KWAPROW ROAD AND ADJOINING LINKS - CAPE COAST

Unengineered selected roads packaged to be rehabilitated. The project is located at Kwaprow and Ankful in two MMDAs (CCMA and KEEA) and was awarded to M/S New Case Properties

Investment Limited for a duration of twenty four (24) calendar month. The total length of the project is 7.4km connecting CCMA and KEEA at Kwaprow and Ankaful respective.  

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.

Award Date     

June 26, 2018

Funding Agency 

GRF

 

24.77 % physical progress

CONSTRUCTION OF AKWELLEY NEWTOWN – OPEIKUMA ROADS (5.90KM)

Unengineered selected roads with erosions and gulley packaged for construction. The project is located at Kasoa in the ASEMA and was awarded to M/S Fingerprints Construction and Trading Limited. The total length of the project is 5.9km of selected roads connecting Kasoa – Bawjiase road to the Colomba road and Opekuma/Ofaaakor to Big Apple Junction .  

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.

Award Date 

October 22, 2018

Funding Agency  

GRF

 

31.04% physical progress

REHABILITATION OF KOMENDA TOWN ROADS

Unengineered selected roads with erosions and gulley packaged to be rehabilitated. The project is located at Komenda in the KEEAMA and was awarded to M/S Kingspok Company Limited. The total length of the project is 5.07km of selected roads within the Komenda Town.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, and surface dressing and traffic management and safety.

Award Date 

July 30, 2019

Funding Agency  

GRF

 

31 % physical progress

CONSTRUCTION OF GHANA FLAG, CP LINKS AND ROMAN AREA ROADS

Unengineered selected roads with erosions and gulley packaged for construction. The project is located at Kasoa in the ASEMA and was awarded to M/S Obokom Civil Engineering Limited. The total length of the project is 5.20km of selected roads within three communities.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding, and enhance economic and social activities.

Construction of 0.6m U-drain, 0.9m u-drain, culverts and storm drains, laying of kerbs, laying of sub base and base, Primer seal & Seal and traffic management and safety.

Award Date    

July 30, 2019

 

Funding Agency    

 

GRF

 

38.61 % physical progress

REHABILITATION OF ANGLICAN CHURCH - COPA JUNCTION & GYAHADZE - ATECHEDO ROAD, WINNEBA

Unengineered selected roads with erosions and gulley and section of the main surfaced dressed Winneba road with defects packaged to be rehabilitated and asphalt overlaid respectively. The project is located at Winneba in the EMA and was awarded to M/S Lancaster Construction Limited. The total length of the project is 2.40km of selected roads within three communities.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities, strengthen the existing pavement structure and correct the surface defects,

Construction of 0.6m and 0.9m U-drains, laying of edge beams, construction of culverts, laying of base and sub-base courses, surface dressing and asphaltic overlay and traffic management and safety

Award Date   

May 29, 2019

Funding Agency  

GRF

 

24.65 % physical

CONSTRUCTION OF EYIGYA LODGE - VETERINARY AND KOJO BEEDU - WATER WORKS ROADS – WINNEBA

Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Winneba in the EMA and was awarded to M/S Lancaster Construction Limited. The total length of the project is 2.60km of selected roads in two communities.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date

April 14, 2020

Commencement Date

January 29, 2021

Completion Date 

January 29, 2022

Contract sum

GH¢ 5,677,514.30

Funding Agency

GRF

 

18.59 %  physical progress

CONSTRUCTION OF ZION SCHOOL AREA ROADS

Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Kasoa in the ASEMA and was awarded to M/ Traq Construction Limited. The total length of the project is 8.55km of selected roads.

  1. Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.
  1. construction of 0.6m and 0.9m U-drains, laying of edge beams, construction of culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date   

July 13, 2020

Funding Agency 

GRF

 

9.45 %  physical progress

SURFACING OF SELECTED ROADS IN ELMINA ZONGO, ELMINA - PH 1

Selected existing graveled roads with erosions and gulleys with drains at some sections, packaged to be upgraded to seal level. The project is located at Elimna Zongo in the

KEEAMA and was awarded to M/ Orel City Company Limited for a duration of eight (8) calendar month. The total length of the project is 1.08km of selected roads.

  1. Aimed to improve accessibility, reduce travel time and cost, and enhance economic and social activities.

  1. Drainage works, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date    

April 20, 2020

Funding Agency

GRF

 

58.0 % physical progress

SURFACING OF SELECTED ROADS IN ELMINA ZONGO, ELMINA - PH 2

Selected existing graveled roads with erosions and gulleys with drains at some sections, packaged to be upgraded to seal level. The project is located at Elimna Zongo in the

KEEAMA and was awarded to M/ Orel City Company Limited. The total length of the project is 1.08km of selected roads.

  1. Aimed to improve accessibility, reduce travel time and cost, and enhance economic and social activities.

Drainage works, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date    

April 20, 2020

Funding Agency  

GRF

 

60.0 % physical progress

REHABILITATION OF SELECTED ROADS IN SALTPOND, PHASE 1

Selected gravelled and unengineered roads with erosions and gulleys, packaged for rehabilitation. The project is located at Saltpond in the MMA and was awarded to M/S Orel City Company Limited. The total length of the project is 4.69km of selected roads.

  1. Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, laying of and traffic management and safety.

Award Date 

August 13, 2020

Funding Agency 

GRF

 

53.1 % physical progress

REHABILITATION OF SELECTED ROADS IN SALTPOND, PHASE 2

Selected graveled and unengineered roads with erosions and gulleys, packaged for rehabilitation. The project is located at Saltpond in the MMA and was awarded to M/S Walker Construction Limited. The total length of the project is 5.31km of selected roads.

  1. Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, primer seal and seal and traffic management and safety.

Award Date   

August 13, 2020

Funding Agency    

GRF

 

51.55% physical progress

ASPHALTIC OVERLAY OF SELECTED COLLECTOR AND ARTERIAL ROADS IN CAPE COAST (25.00KM) PHASE 1

Selected poor surfaced dressed roads were packaged to be overplayed with hot mix asphaltic concrete. The project is located at

Cape coast in the CCMA and was awarded to M/S Maripoma Enterprise Limited. The total length of the project is 25.0km of selected roads. 

Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time.

Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.

Award Date

September 22, 2020

Funding Agency      

GRF

 

42.0 % physical progress

REHABILITATION OF KASOA - BAWJIASE ROAD (FROM KASOA – OKLU NKWANTA (8.00KM)

Selection of the Kasoa – Bawjiase road (Kasoa overpass – Oklu Nkwanta) with poor surfaced condition and lack of drainage facility was packaged to be overplayed with hot mix asphaltic concrete. The project is located at Kasoa in the ASEMA and was awarded to M/S Aspire Resources Limited. The total length of the project is 8.0km of selected roads.  

Aimed to strengthen the existing pavement structure, correct the surface defects, and improving existing pavement serviceability as well to improve travel time.

Drainage repairs, pothole patching and sectional repairs and the provision and laying of asphaltic concrete and traffic management works.

Award Date 

September 22, 2020

Funding Agency 

GRF

 

6.97% physical

REHABILITATION OF TWIFO PRASO AREA ROADS (6.20KM)

Unengineered selected roads with erosions and gulleys, packaged to be rehabilitated. The project is located at Twifo Praso in the TAMA and was awarded to M/S China Jiangxi Engineering Ghana Limited. The total length of the project is 6.20km of selected roads within three communities.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of 0.6m and 0.9m U-drains, construction of culverts, laying of kerbs, primer seal and seal and traffic management and safety.

Award Date    

November 24, 2020

Commencement Date

November 3, 2021

Completion Date   

November 3, 2023

Contract sum  

GH¢17,230,289.02

Funding Agency

GRF

 

5.05 % physical progress

REHABILITATION OF MANKESSIM AREA ROADS (5.10KM), PHASE 1

Selected gravelled and unengineered roads with erosions and gulleys, packaged for

rehabilitation. The project is located at

Mankessim in the MMA and was awarded to M/S Orel City Company Limited. The total length of the project is 4.69km of selected roads

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date  

November 24, 2020

Funding Agency

GRF

 

20.98 % physical progress

REHABILITATION OF AGONA DUAKWA AREA ROADS

Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Aona Duakwa in the AEMA and was awarded to M/Palace View Home Limited. The total length of the project is 4.50km of selected roads.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date   

9/22/2020

Funding Agency 

GRF

 

6.15 % physical progress

CONSTRUCTION OF FETTEH WONSOM AREA ROADS, WINNEBA

Unengineered selected roads with erosions and gulleys, packaged to be constructed. The project is located at Winneba in the EMA and was awarded to M/S Miggeron Company Limited. The total length of the project is 3.33km of selected roads in two communities.

Aimed to improve accessibility, reduce travel time and cost, reduce flooding and enhance economic and social activities.

Construction of drains, culverts, laying of base and sub-base courses and surface dressing and traffic management and safety.

Award Date 

4/14/2020

Funding Agency  

GRF

 

11.88 % physical progress

BRIDGE OVER OKRUDU STREAM KPORMOTTEY

Employer: Ministry of Road and Highways

Employer’s representative: Department of Urban Roads

Contractor: M/S Kumi Korsah Ltd.

Consultant: M/S Broad Consult Ltd.

Physical progress achieved by the contractor as at end of December 2022 is 94%.